Brawa 43230 - Electric Locomotive E75 DRG II DC Dig EXTRA
In 1926, DRG ordered further electric locomotives as improvements on the E77 for operation in the southern and central German network. While the electrical systems remained virtually unchanged, a new one part vehicle frame was designed with the axle sequence 1�BB1�. Due to the running gear changes, the maximum permissible speed was set at 70 km/h, raising hopes of better utility in mixed passenger and goods train schedules. 79 locomotives were planned. E75 01-12 went to south Germany, while the E75 51-69 went to Leipzig West, Wahren, Bitterfeld and Magdeburg- Buckau.